Daily drilling / station
Daily drilling / station
Daily drilling / station
Highest:78.81 Lowest:76.22
Highest:85.34 Lowest:84
Products
Product introduction:TC1W Wrap-around Tubing Hanger is used with BO-2 tubing hanger and BO-2 upper flange. The seal between the pipe and the hanger is obtained by energizing the lock-down screws in the upper flange head. It’s a split package that allows it to replace a fluid while maintaining full control of ring pressure. As with all TC Series products, the tubing weight must be suspended or supported from the tubing hanger adapter or connection adapter.