Daily drilling / station
Daily drilling / station
Daily drilling / station
Highest:78.81 Lowest:76.22
Highest:85.34 Lowest:84
About us
Subsea wellhead, subsea tree, part of the subsea process equipment, and charging device are located in the bottom of the sea, the produced oil and gas are connected to the surface of the platform via sea pipe and riser systems for processing and storage. The method of oil recovery is usually divided into dry type and wet oil production. With the development of technology, now in general use a high degree of automation of oil wet way.